When Round Lake Requires a Roof Permit
Round Lake is a different village from Round Lake Beach. This page quotes the Village of Round Lake building permits page, opened October 15, 2026. It does not print a Round Lake permit amount. The Round Lake Beach residential roof permit is a different village’s fee.
More than 100 square feet
The village building permits page says roofing requires a permit when more than 100 square feet are replaced. It puts that area at 4 bundles. A patch under that line is a different question from a tear-off of a whole slope. Ask the village if the measurement is the area of shingles removed or the area of new material, and do not treat this sentence as a waiver for work that also opens the deck.
Round Lake Beach lists roof work as its own residential permit and does not use this 100-square-foot sentence. Do not carry the Round Lake Beach amount, the 24 to 48 hour over-the-counter note, or the April 30 registration date onto a Round Lake house. Those facts stay on the Round Lake Beach permit guide.
Plat, licenses, and an association letter
The same page says most projects need a plat of survey drawn to scale. A contractor applying in Round Lake is asked for copies of the electrical, plumbing, and roofing licenses. If a homeowners association covers the house, the village wants that association’s approval letter before it issues the permit.
Those three items are Round Lake’s checklist, not a Round Lake Beach checklist. A written replacement estimate for a Round Lake house should say who supplies the plat, who holds the licenses, and whether an association letter is still outstanding. A free estimate does not file the application.
Five to ten business days, and emergency repairs
The village describes review as 5 to 10 business days. It also says review by an outside agency can take longer. Do not schedule a tear-off on the day the application is dropped off.
Emergency repairs are handled on a separate line: apply on the first business day after the repair. That is not a license to skip the application. An emergency repair that opens the roof should still be written so the next business day is on the calendar. A stain that can wait is a leak repair, not an emergency.
Codes the village lists
The building permits page lists adopted codes that include the 2018 International Residential Code, the International Building Code, the International Existing Building Code, the International Fire Code, the International Fuel Gas Code, the International Mechanical Code, the 2017 National Electrical Code, the 2018 International Swimming Pool and Spa Code, the 2018 International Property Maintenance Code, and the current Illinois Energy Conservation, Plumbing, and Accessibility codes. A roof job uses the residential and energy lines. It does not use the pool code unless the project is a pool.
This page does not print a Round Lake dollar amount. A figure that sometimes appears in search results for an older document was not on the building permits page when it was opened October 15, 2026, so it is not repeated here. National and Chicago-region prices stay on the cost guide, labeled with their own dates. Prices vary. A free estimate gives the real number.
Fox Lake and Grayslake have their own pages: Fox Lake roof permits and Grayslake roof permits. The other places on the service area page do not, because their roof rules were not read from an official permit page for this update.
Nearby towns
Round Lake Beach Roofing takes free estimate requests in these places. Each one has its own section on the service area page. Name the place on the form.
FAQ
Does Round Lake require a permit to replace shingles?
The village building permits page says roofing requires a permit when more than 100 square feet, which it describes as 4 bundles, are replaced. Confirm a smaller patch with the village before treating it as exempt. This page does not print a fee. The Round Lake Beach residential roof amount is not a Round Lake fee.
What has to be attached to a Round Lake roof application?
The page says most projects need a plat of survey drawn to scale, contractors need copies of electrical, plumbing, and roofing licenses, and an association approval letter is required before the village issues a permit when an association applies. Review is described as 5 to 10 business days, longer if an outside agency is involved.
Can an emergency roof repair wait for the permit?
The village says to apply on the first business day after an emergency repair. That is a deadline, not an exemption from the application. A repair that can wait should be permitted before the tear-off.
Is Round Lake the same permit office as Round Lake Beach?
No. They are different villages. Round Lake Beach’s over-the-counter timing, permit life, and contractor registration are quoted on this site only for Round Lake Beach. Use the Round Lake building permits page for a house in Round Lake.
Sources
- Village of Round Lake, Building Permits Accessed October 15, 2026. Roofing over 100 square feet, plat of survey, contractor license copies, association letter, 5 to 10 business days, emergency repairs, and the adopted-code list.